Old Administration Building

Displaying 201 - 300 of 309
# Title Date Summary
201 Photo
Old Gold 0:0, p.15
Old Administration Building and Auditorium Building; photo.
202 Photo
Old Gold 0:0, p.17
Old Administration Building; photo.
203 Photo
Old Gold 0:0, p.18
Collection of photos on and off campus; photo.
204 Administration Building
Old Gold 0:0, p.11
Front and back of the building; photo.
205 Winter view of Administration Building
College Eye 10:12, p.1
Administration Building; photo.
206 Administration and Auditorium Buildings, I. S. T. C.
College Eye 10:6, p.1
Administration and Auditorium Buildings; photo.
207 Book One The College
Old Gold 0:0, p.
Divider page with illustration of Administration Building.
208 Book Three Organizations
Old Gold 0:0, p.
Divider page with illustration of Administration Building.
209 Book Two The Collegians
Old Gold 0:0, p.
Divider page with illustration of Administration Building.
210 Campus
Old Gold 0:0, p.11
Illustration of one of the gateways; photos of buildings around campus.
211 Photo
Old Gold 0:0, p.3
Photo of Administration Building
212 All Hail! Grand Champion of the Big Links
Old Gold 0:0, p.29
Compilation of photos dealing with golf, buildings on campus, and faculty; creative poem.
213 Photos
Old Gold 0:0, p.33
Photos of various buildings on campus.
214 Photos
Old Gold 0:0, p.25
Winter scenes of campus buildings.
215 Photo
Old Gold 0:0, p.8
Old Administration Building; photo.
216 Scenes about the Iowa State Teachers College
Old Gold 0:0, p.13
Photo.
217 View of buildings from the Southeast
Old Gold 0:0, p.2
Color photo.
218 East Campus, Administration Building in the background
Old Gold 0:0, p.17
Photo.
219 Iowa State Teachers College--1913
Old Gold 0:0, p.
A panoramic view from the east, includes buildings and students.
220 View of buildings from the southeast
Old Gold 0:0, p.10
Photo.
221 Administration Building
Old Gold 0:0, p.7
Photo.
222 East side of the Quadrangle
Old Gold 0:0, p.11
Photo.
223 Northeast corner of the Quadrangle
Old Gold 0:0, p.13
Photo.
224 Photo
Old Gold 0:0, p.15
Photo of Old Administration Building.
225 Administration Building
Old Gold 0:0, p.9
Photo.
226 Untitled
Normal Eyte 21:0, p.0
Two students bid farewell to ISTC as they drive away in a car.
227 Photos of campus buildings
Old Gold 0:0, p.12
Photos.
228 Untitled
Old Gold 0:0, p.230
Photo of College Street.
229 Trustees' pictures in hall
Normal Eyte 20:8, p.139
Placed in corridor near President Seerley's office.
230 Administration and Auditorium buildings
Old Gold 0:0, p.
Photo.
231 Historical
Old Gold 0:0, p.6
History of public normal schools in Iowa; special emphasis on the early history of the Iowa State Normal School; photo.
232 Iowa State Normal School building
Old Gold 0:0, p.214
Photo.
233 East front, looking southwest
Old Gold 0:0, p.108
View of campus; photo.
234 Iowa State Normal School
Normal Eyte 17:1, p.5
Auditorium and Old Administration Building pictured from the east; photo.
235 Corner of Library
Pedagog 0:0, p.141
Photo.
236 Normal views
Pedagog 0:0, p.140
Old Administration Building; photo.
237 South east view
Pedagog 0:0, p.4
View of campus from the southeast; photo.
238 Views of the Iowa State Normal School
Pedagog 0:0, p.147
Views of the main buildings, 1905; photo.
239 Iowa State Normal School
Normal Eyte 16:1, p.2
View from northeast corner of campus; photo.
240 Homer Horatio Seerley
Normal Eyte Annual 0:0, p.3
Biographical profile of President Seerley; photo.
241 The library
Normal Eyte Annual 0:0, p.71
Contains over 20,000 pieces of material; photo.
242 Central Hall from south campus
Normal Eyte 15:14, p.211
Central Hall; photo.
243 The southeast campus
Normal Eyte 15:6, p.82
A photo of the southeast side of campus.
244 Front view Iowa State Normal School; showing front campus, Pres. Seerley's cottage, Central Hall, and Auditorium Building
Normal Eyte 15:1, p.9
A photo of the front entrance to campus.
245 Our new gym; bricklayers will soon be here again
Normal Eyte 14:26, p.412
Will used glazed brick on interiors; swimming pool completion date unclear; heating and ventilation contracts let; two new boilers will be added; hope that most of the facility will be available for fall 1904.
246 Among the visitors
Normal Eyte 14:17, p.262
C. C. Upton and wife Eva Leland visited Normal.
247 Almost perpetual motion; the new automatic electric clocks need no winding and are accurate in the extreme
Normal Eyte 14:2, p.18
Description of the new clock mechanism.
248 New clock
Normal Eyte 14:2, p.30
A new clock is in the library.
249 Carpenters
Normal Eyte 13:15, p.238
New stairway and benches being installed.
250 The doors from the library
Normal Eyte 12:13, p.204
Now easy passage between the Old Administration Building and the new Auditorium Building.
251 Work has commenced
Normal Eyte 11:29, p.715
On the connection between the Auditorium Building and the Administration Building.
252 Work on the connecting corridor
Normal Eyte 11:28, p.688
Work on Crossroads well underway.
253 Official
Normal Eyte 9:30, p.708
J. B. Knoepfler will head the new German Department in the fall; state colleges and university have new policy with regard to the use of alcoholic beverages; James E. Robinson will supervise construction of new building; hope to select architect in June.
254 Official: Hon. Edward Townsend; death of an honored citizen widely known and respected
Normal Eyte 9:16, p.375
Lengthy tribute to Edward Townsend and his contributions to ISNS and Cedar Falls.
255 The Normal buildings
Normal Eyte 9:14, p.333
Doors and windows modified.
256 Messrs. McDuffie and Mullin
Normal Eyte 9:1, p.6
Will meet with contractors for bridge between South and Central Halls and for drainage and grading work on Normal Street.
257 The Board of Trustees
Normal Eyte 7:36, p.6
News of recent action including electricity for the chapel, new musical organizations, and contracts with the local school district.
258 State Normal buildings and grounds
Normal Eyte 7:35, p.
Panoramic view from the east; photo.
259 Biennial period, 1895-1897; the President's report
Normal Eyte 7:11, p.123
President Seerley reports on the Special Primary course, the Old Administration Building, the science, geography, and drawing curricula, the Student Battalion, electrical service, and a penmanship course.
260 The wide hall connecting the new building and South Hall
Normal Eyte 7:6, p.69
Pictures displayed there.
261 State Normal buildings
Normal Eyte 6:33, p.386
Panoramic view from the east; photo.
262 Perhaps the greatest change
Normal Eyte 6:2, p.15
Natural science lab fitted up in the third story of the Administration Building; fifteen microscopes added.
263 The new chemical laboratory
Normal Eyte 6:2, p.15
Now located in south room of Administration Building; description of new facilities.
264 The new museum cases
Normal Eyte 6:2, p.15
New rooms assigned to museum collections.
265 Iowa State Normal, Cedar Falls, Iowa
Normal Eyte 5:31, p.297
The ISNS buildings from the east; photo.
266 The report of Miss Anna M. Baker
Normal Eyte 5:26, p.237
Report for the library in its first term in its new location in the Administration Building.
267 The sign, "No admittance to the third floor"
Normal Eyte 5:24, p.223
Third floor of new building now open.
268 The physical culture class
Normal Eyte 5:20, p.184
Enjoying new space in basement of new Administration Building.
269 The new clocks
Normal Eyte 5:16, p.143
Are a great convenience.
270 Of all the things that make the Normal student rejoice
Normal Eyte 5:15, p.134
Enjoying the library in its new quarters in the new building.
271 The new office furniture
Normal Eyte 5:15, p.133
President Seerley enjoying new furniture.
272 Mr. Fulkerson
Normal Eyte 5:14, p.121
Architect of new building visits campus.
273 The Board of Directors
Normal Eyte 5:14, p.122
Meet in new building.
274 Mr. Fullerton's music class
Normal Eyte 5:13, p.112
Met in new building.
275 Pres. Seerley's class
Normal Eyte 5:13, p.113
Will teach in new building.
276 On Friday
Normal Eyte 5:12, p.105
Showed guests the new building.
277 The new central building
Normal Eyte 5:11, p.81
President Seerley gives a lengthy description of the new building, including construction materials and floor plans; two story corridor or bridge connects it with Gilchrist Hall; first and second floors are ready for use; third floor ready in September.
278 The mosaic floor
Normal Eyte 5:5, p.37
Floor in main hallway of new building is finished.
279 The woodwork
Normal Eyte 5:5, p.37
Being installed in the new building.
280 The workmen
Normal Eyte 5:5, p.37
Finished installing the vault in the new building.
281 A suggestion
Normal Eyte 5:4, p.30
Some students think that the new building should be named Seerley Hall.
282 All will be glad to learn
Normal Eyte 5:3, p.21
Woodwork and mosaic flooring in Administration Building being installed.
283 Our readers abroad
Normal Eyte 5:1, p.7
Plastering on lower floor of Administration Building finished; library may move to new building by end of October.
284 The opening week of school
Normal Eyte 5:1, p.1
Enrollment approaching one thousand; Administration Building should be ready by January 1, 1896; landscaping and drives modified on campus front lawn; steps removed from Central Hall; power plant under construction; teachers deal with crowded classrooms.
285 When the old students on their return
Normal Eyte 5:1, p.7
Exterior of new Administration Building is complete; front steps of Central Hall removed; front drive removed; all carriages must go behind building.
286 Five years of rapid growth
Normal Eyte 4:36, p.567
Good look at development of College Hill after Boarding Department closed; development of housing and other improvements including Seerley Park.
287 The state is pushing work
Normal Eyte 4:36, p.568
Cartoon shows faculty working on Administration Building.
288 Untitled
Normal Eyte 4:36, p.564
Engraving of new building; photo.
289 The brick work
Normal Eyte 4:34, p.540
First story of new building nearing completion; have had difficulty in securing lumber.
290 Monday afternoon
Normal Eyte 4:28, p.442
President Seerley and board members meet to decide on heating system for Administration Building.
291 Work is being pushed
Normal Eyte 4:27, p.427
Stone work will soon be done on Administration Building; most material is on site.
292 Untitled
Normal Eyte 4:22, p.345
Engraving of new building, later the Old Administration Building.
293 We are pleased
Normal Eyte 4:22, p.341
Detailed look at plans and progress on the new building (Old Administration); will house library, offices, recitation rooms, gymnasium, natural science department, and museum; corridor will connect the building to Gilchrist Hall.
294 At the beginning of the last term
Normal Eyte 4:15, p.229
Enrollment now 660 students plus sixty-five in the Preparatory Department and sixty-two in the Training School; looking forward to completion of Administration Building; will enrollment reach one thousand?
295 Mr. Editor
Normal Eyte 4:8, p.119
Would like to see the Board support the remodeling and furnishing of literary society rooms.
296 Excavating for the new building is progressing rapidly
Normal Eyte 4:5, p.75
Saturday activities in other buildings cancelled while water pipes were connected.
297 Excavating for the new building
Normal Eyte 4:4, p.57
Will cause detours for students; foundation expected to be finished this fall.
298 The regular term reception
Normal Eyte 4:1, p.12
Hard to find a place large enough to accommodate increased numbers of students; would like reception room in new building.
299 Society halls
Normal Eyte 3:30, p.233
Societies would like dedicated rooms in the new building; Board asks if they would accept rooms on third floor of Central Hall.
300 Y. M. & Y. W. C. A.
Normal Eyte 3:29, p.227
Meeting leaders announced; beginning to think of a new home now that a new building is in store.